Assessment Year | 2012 |
---|---|
Principal Product | Plastic Jugs |
NAICS | 326160: Plastics Bottle Manufacturing |
SIC | 3085: Plastics Bottles |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
14,000
ft2
|
Annual Production | 5,500,000
pieces
|
Production Hrs. Annual | 7,900
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $200,191 | 4,742,880 |
kWh
|
$0.042 |
Electricity Demand | $65,297 | 9,645 |
kW-mo/yr
|
$6.77 |
Electricity Fees | $16,925 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,295 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,675 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 3.7121: Improve handling practices | $7,884 | $60 | - | - | $7,884 | |
02 | 2.2626: Avoid frost formation on evaporators | $8,968 | - |
$6,943
160,633
kWh
|
$2,025
-
kW-mo/yr
|
- | |
03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $3,021 | $10,000 |
$3,021
69,909
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,053 | $8,053 |
$5,519
127,704
kWh
|
$1,534
-
kW-mo/yr
|
- | |
05 | 2.4224: Upgrade controls on compressors | $17,738 | $17,500 |
$15,127
350,011
kWh
|
$2,611
-
kW-mo/yr
|
- | |
06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $631 | $4,131 |
$631
14,597
kWh
|
- | - | |
TOTAL RECOMMENDED | $45,295 | $39,744 |
$31,241
722,854
kWh
|
$6,170
-
kW-mo/yr
|
$7,884 | ||
TOTAL IMPLEMENTED | $32,675 | $25,613 |
$20,646
477,715
kWh
|
$4,145
-
kW-mo/yr
|
$7,884 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs