ITAC Assessment: OR0586
ITAC logo
ITAC Assessment: OR0586
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Cleaned Buses
NAICS 485113: Bus and Other Motor Vehicle Transit Systems
SIC 4111: Local and Suburban Transit
Sales Range less than $500
k
# of Employees 78
Plant Area 63,644
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,419 1,764,570
kWh
Natural Gas $53,167 5,473
MMBtu
Fuel Oil #2 $7,013,040 304,079
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $528,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,449

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4112: Install soft-start to eliminate nuisance trips $7,216 $7,500 $7,216
122,729
kWh
- - - - -
02 2.1221: Replace obsolete burners with more efficient ones $5,374 $200 - - $5,374
-
MMBtu
- - -
03 2.4226: Use / purchase optimum sized compressor $2,914 $812 $2,914
49,565
kWh
- - - - -
04 2.1336: Install equipment to utilize waste fuel $507,177 $120,000 - - - $507,177
-
MMBtu
- -
05 2.7135: Install occupancy sensors $1,267 $4,001 $879
14,953
kWh
$46
-
kW-mo/yr
- - $201 $141
06 2.1233: Analyze flue gas for proper air/fuel ratio $666 $500 - - $1,166
-
MMBtu
- $(-500.0) -
07 2.8114: Change rate schedules or other changes in utility service $762 - - - - - - $762
08 2.4231: Reduce the pressure of compressed air to the minimum required $3,517 $3,375 $3,275
55,694
kWh
$242
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $528,893 $136,388 $14,284
242,941
kWh
$288
-
kW-mo/yr
$6,540
-
MMBtu
$507,177
-
MMBtu
$(-299.0) $903
TOTAL IMPLEMENTED $20,449 $12,387 $13,405
227,988
kWh
$242
-
kW-mo/yr
$6,540
-
MMBtu
- $(-500.0) $762
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs