Assessment Year | 2012 |
---|---|
Principal Product | Cleaned Buses |
NAICS | 485113: Bus and Other Motor Vehicle Transit Systems |
SIC | 4111: Local and Suburban Transit |
Sales Range | less than $500 k |
# of Employees | 78 |
Plant Area |
63,644
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $110,419 | 1,764,570 |
kWh
|
$0.063 |
Natural Gas | $53,167 | 5,473 |
MMBtu
|
$9.71 |
Fuel Oil #2 | $7,013,040 | 304,079 |
MMBtu
|
$23.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $528,893 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,449 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4112: Install soft-start to eliminate nuisance trips | $7,216 | $7,500 |
$7,216
122,729
kWh
|
- | - | - | - | - | |
02 | 2.1221: Replace obsolete burners with more efficient ones | $5,374 | $200 | - | - |
$5,374
-
MMBtu
|
- | - | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $2,914 | $812 |
$2,914
49,565
kWh
|
- | - | - | - | - | |
04 | 2.1336: Install equipment to utilize waste fuel | $507,177 | $120,000 | - | - | - |
$507,177
-
MMBtu
|
- | - | |
05 | 2.7135: Install occupancy sensors | $1,267 | $4,001 |
$879
14,953
kWh
|
$46
-
kW-mo/yr
|
- | - | $201 | $141 | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $666 | $500 | - | - |
$1,166
-
MMBtu
|
- | $(-500.0) | - | |
07 | 2.8114: Change rate schedules or other changes in utility service | $762 | - | - | - | - | - | - | $762 | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,517 | $3,375 |
$3,275
55,694
kWh
|
$242
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $528,893 | $136,388 |
$14,284
242,941
kWh
|
$288
-
kW-mo/yr
|
$6,540
-
MMBtu
|
$507,177
-
MMBtu
|
$(-299.0) | $903 | ||
TOTAL IMPLEMENTED | $20,449 | $12,387 |
$13,405
227,988
kWh
|
$242
-
kW-mo/yr
|
$6,540
-
MMBtu
|
- | $(-500.0) | $762 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs