Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Education Services at the seconary level
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 143
Plant Area 236,000
ft2
Annual Production 1,200
units
Production Hrs. Annual 1,584
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,000 2,420,392
kWh
Electricity Demand $34,276 5,807
kW-mo/yr
Electricity Fees $591 -
Natural Gas $25,155 4,539
MMBtu
Waste Disposal Costs
Water Usage $27,444 9,794
Tgal
TOTAL YEARLY COSTS $218,465
RECOMMENDED SAVINGS* $10,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Usage Savings
01 2.7241: Install outside air damper / economizer on hvac unit $705 $2,756 $705
13,026
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $359 $1,777 $359
6,649
kWh
-
03 3.4151: Minimize water usage $3,316 $240 - $3,316
-
Tgal
04 2.7135: Install occupancy sensors $545 $988 $545
10,068
kWh
-
05 2.7314: Reduce ventilation air $5,215 $2,400 $5,215
96,360
kWh
-
TOTAL RECOMMENDED $10,140 $8,161 $6,824
126,103
kWh
$3,316
-
Tgal
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs