Assessment Year | 2012 |
---|---|
Principal Product | Veneer |
NAICS | 321212: Softwood Veneer and Plywood Manufacturing |
SIC | 2436: Softwood Veneer and Plywood |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
86,000
ft2
|
Annual Production | 100,000
thousand feet
|
Production Hrs. Annual | 5,616
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $568,256 | 10,868,889 |
kWh
|
$0.052 |
Electricity Demand | $197,100 | 32,743 |
kW-mo/yr
|
$6.02 |
Natural Gas | $315,070 | 70,332 |
MMBtu
|
$4.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $127,454 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,161 | $1,000 |
$7,005
133,108
kWh
|
$3,155
-
kW-mo/yr
|
- | |
02 | 2.4224: Upgrade controls on compressors | $30,460 | $37,511 |
$22,987
436,764
kWh
|
$7,473
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,590 | $16,590 |
$12,905
245,209
kWh
|
$2,684
-
kW-mo/yr
|
- | |
04 | 2.2127: Flash condensate to produce lower pressure steam | $36,155 | $7,334 | - | - |
$36,155
-
MMBtu
|
|
05 | 2.2136: Install / repair insulation on steam lines | $7,488 | $6,761 | - | - |
$7,488
-
MMBtu
|
|
06 | 2.6218: Turn off equipment when not in use | $27,601 | $81,000 |
$20,559
390,624
kWh
|
$7,043
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $127,454 | $150,195 |
$63,456
1,205,705
kWh
|
$20,355
-
kW-mo/yr
|
$43,643
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs