| Assessment Year | 2012 |
|---|---|
| Principal Product | Veneer |
| NAICS | 321212: Softwood Veneer and Plywood Manufacturing |
| SIC | 2436: Softwood Veneer and Plywood |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
86,000
ft2
|
| Annual Production | 100,000
thousand feet
|
| Production Hrs. Annual | 5,616
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $568,256 | 10,868,889 |
kWh
|
$0.052 |
| Electricity Demand | $197,100 | 32,743 |
kW-mo/yr
|
$6.02 |
| Natural Gas | $315,070 | 70,332 |
MMBtu
|
$4.48 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $127,454 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,161 | $1,000 |
$7,005
133,108
kWh
|
$3,155
-
kW-mo/yr
|
- | |
| 02 | 2.4224: Upgrade controls on compressors | $30,460 | $37,511 |
$22,987
436,764
kWh
|
$7,473
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,590 | $16,590 |
$12,905
245,209
kWh
|
$2,684
-
kW-mo/yr
|
- | |
| 04 | 2.2127: Flash condensate to produce lower pressure steam | $36,155 | $7,334 | - | - |
$36,155
-
MMBtu
|
|
| 05 | 2.2136: Install / repair insulation on steam lines | $7,488 | $6,761 | - | - |
$7,488
-
MMBtu
|
|
| 06 | 2.6218: Turn off equipment when not in use | $27,601 | $81,000 |
$20,559
390,624
kWh
|
$7,043
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $127,454 | $150,195 |
$63,456
1,205,705
kWh
|
$20,355
-
kW-mo/yr
|
$43,643
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs