ITAC Assessment: OR0581
ITAC logo
ITAC Assessment: OR0581
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Veneer
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 86,000
ft2
Annual Production 100,000
thousand feet
Production Hrs. Annual 5,616
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $568,256 10,868,889
kWh
Electricity Demand $197,100 32,743
kW-mo/yr
Natural Gas $315,070 70,332
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,454 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $10,161 $1,000 $7,005
133,108
kWh
$3,155
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $30,460 $37,511 $22,987
436,764
kWh
$7,473
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,590 $16,590 $12,905
245,209
kWh
$2,684
-
kW-mo/yr
-
04 2.2127: Flash condensate to produce lower pressure steam $36,155 $7,334 - - $36,155
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $7,488 $6,761 - - $7,488
-
MMBtu
06 2.6218: Turn off equipment when not in use $27,601 $81,000 $20,559
390,624
kWh
$7,043
-
kW-mo/yr
-
TOTAL RECOMMENDED $127,454 $150,195 $63,456
1,205,705
kWh
$20,355
-
kW-mo/yr
$43,643
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs