ITAC Assessment: OR0577
ITAC logo
ITAC Assessment: OR0577
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Dimensional Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 165,417
ft2
Annual Production 100,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $675,041 15,372,000
kWh
Electricity Demand $232,984 43,794
kW-mo/yr
Natural Gas $1,021,383 193,126
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,529 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,625

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $25,558 $7,571 $25,558
558,640
kWh
- -
02 2.2136: Install / repair insulation on steam lines $2,191 $1,404 - - $2,191
-
MMBtu
03 2.4131: Size electric motors for peak operating efficiency $7,720 $8,890 $7,720
168,735
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $9,839 $17,100 $7,653
167,274
kWh
$2,186
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,184 $4,750 $1,576
34,438
kWh
$609
-
kW-mo/yr
-
06 2.6126: Keep solid fuels / raw materials dry $12,037 $50,000 - - $12,037
-
MMBtu
TOTAL RECOMMENDED $59,529 $89,715 $42,506
929,086
kWh
$2,795
-
kW-mo/yr
$14,228
-
MMBtu
TOTAL IMPLEMENTED $49,625 $76,075 $33,211
725,913
kWh
$2,186
-
kW-mo/yr
$14,228
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs