| Assessment Year | 2021 |
|---|---|
| Principal Product | Lumber |
| NAICS | 321911: Wood Window and Door Manufacturing |
| SIC | 2431: Millwork |
| Sales Range | $50 M to 100M |
| # of Employees | 39 |
| Plant Area |
150,000
ft2
|
| Annual Production | 100,000
units
|
| Production Hrs. Annual | 5,720
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $45,476 | 995,099 |
kWh
|
$0.046 |
| Electricity Demand | $17,989 | 4,482 |
kW-mo/yr
|
$4.01 |
| Electricity Fees | $15,312 | - |
|
- |
| Natural Gas | $26,629 | 7,783 |
MMBtu
|
$3.42 |
| Fuel Oil #2 | $8,321 | 603 |
MMBtu
|
$13.80 |
| Other Energy | $3,962 | 235 |
MMBtu
|
$16.86 |
| TOTAL YEARLY COSTS | $117,689 | |||
| RECOMMENDED SAVINGS* | $16,937 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,197 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Other Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $824 | $35 |
$672
14,619
kWh
|
$152
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,197 | $14,875 |
$5,152
111,997
kWh
|
$1,045
-
kW-mo/yr
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $2,917 | $8,000 | - | - |
$2,917
-
MMBtu
|
- | |
| 04 | 2.7233: Use properly designed and sized hvac equipment | $2,375 | $7,600 | - | - |
$2,375
-
MMBtu
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $289 | $1,000 |
$245
5,317
kWh
|
$44
-
kW-mo/yr
|
- | - | |
| 06 | 2.4226: Use / purchase optimum sized compressor | $3,092 | $12,000 |
$2,593
56,365
kWh
|
$499
-
kW-mo/yr
|
- | - | |
| 07 | 2.1332: Convert combustion equipment to burn natural gas | $1,243 | $6,000 | - | - |
$827
-
MMBtu
|
$416
-
MMBtu
|
|
| TOTAL RECOMMENDED | $16,937 | $49,510 |
$8,662
188,298
kWh
|
$1,740
-
kW-mo/yr
|
$6,119
-
MMBtu
|
$416
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,197 | $14,875 |
$5,152
111,997
kWh
|
$1,045
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Other Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs