ITAC Assessment: OR0571
ITAC logo
ITAC Assessment: OR0571
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Dimension Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area 34,380
ft2
Annual Production 40,000,000
units
Production Hrs. Annual 3,094
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,298 3,906,178
kWh
Electricity Demand $50,092 15,852
kW-mo/yr
Electricity Fees $9,192 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $329,269 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,623

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings Ancillary Material Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $4,717 $1,120 $9,902
304,200
kWh
- $(-4,625.0)
-
MMBtu
$(-560.0)
02 2.4224: Upgrade controls on compressors $13,809 $52,890 $10,894
334,686
kWh
$2,915
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,616 $2,200 $2,308
70,902
kWh
$1,308
-
kW-mo/yr
- -
04 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,906 $7,000 $1,399
42,987
kWh
$507
-
kW-mo/yr
- -
05 2.6218: Turn off equipment when not in use $989 $2,400 $989
30,394
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $15,292 $44,400 $10,200
313,000
kWh
$257
-
kW-mo/yr
- $4,835
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,940 $12,340 $1,810
55,599
kWh
$2,130
-
kW-mo/yr
- -
08 3.1191: Change procedures / equipment / operating conditions $285,000 $626,000 - - - $285,000
TOTAL RECOMMENDED $329,269 $748,350 $37,502
1,151,768
kWh
$7,117
-
kW-mo/yr
$(-4,625.0)
-
MMBtu
$289,275
TOTAL IMPLEMENTED $34,623 $106,490 $24,801
761,575
kWh
$4,987
-
kW-mo/yr
- $4,835
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs