Assessment Year | 2011 |
---|---|
Principal Product | Dimension Lumber |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 57 |
Plant Area |
34,380
ft2
|
Annual Production | 40,000,000
units
|
Production Hrs. Annual | 3,094
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $123,298 | 3,906,178 |
kWh
|
$0.032 |
Electricity Demand | $50,092 | 15,852 |
kW-mo/yr
|
$3.16 |
Electricity Fees | $9,192 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $329,269 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,623 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $4,717 | $1,120 |
$9,902
304,200
kWh
|
- |
$(-4,625.0)
-
MMBtu
|
$(-560.0) | |
02 | 2.4224: Upgrade controls on compressors | $13,809 | $52,890 |
$10,894
334,686
kWh
|
$2,915
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,616 | $2,200 |
$2,308
70,902
kWh
|
$1,308
-
kW-mo/yr
|
- | - | |
04 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $1,906 | $7,000 |
$1,399
42,987
kWh
|
$507
-
kW-mo/yr
|
- | - | |
05 | 2.6218: Turn off equipment when not in use | $989 | $2,400 |
$989
30,394
kWh
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,292 | $44,400 |
$10,200
313,000
kWh
|
$257
-
kW-mo/yr
|
- | $4,835 | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,940 | $12,340 |
$1,810
55,599
kWh
|
$2,130
-
kW-mo/yr
|
- | - | |
08 | 3.1191: Change procedures / equipment / operating conditions | $285,000 | $626,000 | - | - | - | $285,000 | |
TOTAL RECOMMENDED | $329,269 | $748,350 |
$37,502
1,151,768
kWh
|
$7,117
-
kW-mo/yr
|
$(-4,625.0)
-
MMBtu
|
$289,275 | ||
TOTAL IMPLEMENTED | $34,623 | $106,490 |
$24,801
761,575
kWh
|
$4,987
-
kW-mo/yr
|
- | $4,835 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs