ITAC Assessment: OR0568
ITAC logo
ITAC Assessment: OR0568
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 199
Plant Area 322,438
ft2
Annual Production 400,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,357,573 133,936,185
kWh
Electricity Demand $751,200 240,000
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $172,677 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $13,790 $2,100 $7,960
165,000
kWh
$5,830
-
kW-mo/yr
-
02 2.6231: Utilize controls to operate equipment only when needed $1,800 $1,390 $1,800
37,400
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $2,189 $2,050 $2,189
45,391
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $152,958 $711,732 $127,334
2,640,689
kWh
$930
-
kW-mo/yr
$24,694
05 2.4322: Use or replace with energy efficient substitutes $1,940 $10,000 $1,940
40,200
kWh
- -
TOTAL RECOMMENDED $172,677 $727,272 $141,223
2,928,680
kWh
$6,760
-
kW-mo/yr
$24,694
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs