ITAC Assessment: UA0177
ITAC logo
ITAC Assessment: UA0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product clutch plates
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 294
Plant Area 128,841
ft2
Annual Production 20,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $319,977 4,334,903
kWh
Electricity Fees $31,397 -
Natural Gas $1,980 508
MMBtu
Waste Disposal Costs
Water Usage $18,016 41,290
Tgal
Water Disposal $14,780 41,290
Tgal
TOTAL YEARLY COSTS $386,150
RECOMMENDED SAVINGS* $7,475 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,476

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,201 $1,265 $4,904
66,438
kWh
$297
02 2.4231: Reduce the pressure of compressed air to the minimum required $999 $500 $942
12,757
kWh
$57
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,275 $480 $1,202
16,278
kWh
$73
TOTAL RECOMMENDED $7,475 $2,245 $7,048
95,473
kWh
$427
TOTAL IMPLEMENTED $6,476 $1,745 $6,106
82,716
kWh
$370
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs