ITAC Assessment: OR0547
ITAC logo
ITAC Assessment: OR0547
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Dimensional Lumber, Specialty order Lumber and Beams
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 100,000
ft2
Annual Production 20,000
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,750 3,074,720
kWh
Electricity Demand $72,095 15,943
kW-mo/yr
Electricity Fees $29,714 -
Wood $195,000 171,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $167,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,108

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
01 2.1336: Install equipment to utilize waste fuel $90,740 $81,950 - - - $90,740
-
MMBtu
02 2.1232: Keep boiler tubes clean $39,218 $44,000 - - - $39,218
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $939 $1,042 - - - $939
-
MMBtu
04 2.4323: Use optimum size and capacity equipment $705 - $705
16,000
kWh
- - -
05 2.4239: Eliminate or reduce compressed air usage $5,091 $5,000 $3,305
75,000
kWh
$1,786
-
kW-mo/yr
- -
06 2.4224: Upgrade controls on compressors $16,829 $20,313 $11,943
271,853
kWh
$4,886
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $4,257 $500 $3,627
85,000
kWh
$630
-
kW-mo/yr
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,090 $500 $1,090
22,815
kWh
- - -
09 2.8112: Combine utility meters $6,709 - - - $6,709 -
10 2.4133: Use most efficient type of electric motors $2,270 $15,676 $2,270
33,072
kWh
- - -
TOTAL RECOMMENDED $167,848 $168,981 $22,940
503,740
kWh
$7,302
-
kW-mo/yr
$6,709 $130,897
-
MMBtu
TOTAL IMPLEMENTED $77,108 $87,031 $22,940
503,740
kWh
$7,302
-
kW-mo/yr
$6,709 $40,157
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs