Assessment Year | 2008 |
---|---|
Principal Product | Peptides, Amino Acids |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
9,400
ft2
|
Annual Production | 55,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $271,702 | 5,319,600 |
kWh
|
$0.051 |
Natural Gas | $187,178 | 19,088 |
MMBtu
|
$9.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $348,182 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $277,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1336: Install equipment to utilize waste fuel | $277,000 | $77,500 | - | - |
$277,000
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,123 | $8,200 |
$13,123
305,199
kWh
|
- | - | |
03 | 2.7135: Install occupancy sensors | $10,377 | $3,000 |
$10,377
130,849
kWh
|
- | - | |
04 | 2.4224: Upgrade controls on compressors | $8,200 | $8,200 |
$8,200
130
kWh
|
- | - | |
05 | 2.9114: Use solar heat to make electricty | $18,926 | $289,553 |
$18,926
393
kWh
|
- | - | |
06 | 2.3212: Optimize plant power factor | $1,170 | $5,250 | - | $1,170 | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $19,386 | $49,854 | - | - |
$19,386
-
MMBtu
|
|
TOTAL RECOMMENDED | $348,182 | $441,557 |
$50,626
436,571
kWh
|
$1,170 |
$296,386
-
MMBtu
|
||
TOTAL IMPLEMENTED | $277,000 | $77,500 | - | - |
$277,000
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs