ITAC Assessment: OR0541
ITAC logo
ITAC Assessment: OR0541
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Peptides, Amino Acids
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 9,400
ft2
Annual Production 55,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,702 5,319,600
kWh
Natural Gas $187,178 19,088
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $348,182 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $277,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.1336: Install equipment to utilize waste fuel $277,000 $77,500 - - $277,000
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,123 $8,200 $13,123
305,199
kWh
- -
03 2.7135: Install occupancy sensors $10,377 $3,000 $10,377
130,849
kWh
- -
04 2.4224: Upgrade controls on compressors $8,200 $8,200 $8,200
130
kWh
- -
05 2.9114: Use solar heat to make electricty $18,926 $289,553 $18,926
393
kWh
- -
06 2.3212: Optimize plant power factor $1,170 $5,250 - $1,170 -
07 2.2414: Use waste heat from hot flue gases to preheat $19,386 $49,854 - - $19,386
-
MMBtu
TOTAL RECOMMENDED $348,182 $441,557 $50,626
436,571
kWh
$1,170 $296,386
-
MMBtu
TOTAL IMPLEMENTED $277,000 $77,500 - - $277,000
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs