Assessment Year | 2006 |
---|---|
Principal Product | envelopes |
NAICS | 322230: Stationery Product Manufacturing |
SIC | 2677: Envelopes |
Sales Range | $50 M to 100M |
# of Employees | 100 |
Plant Area |
187,000
ft2
|
Annual Production | 1,500,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $360,859 | 8,852,960 |
kWh
|
$0.041 |
Electricity Demand | $162,709 | 16,216 |
kW-mo/yr
|
$10.03 |
Electricity Fees | $31,977 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $442,590 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $23,520 | $2,095 |
$19,010
465,937
kWh
|
$6,070
-
kW-mo/yr
|
$(-1,560.0) | - | - | |
02 | 2.2522: Isolate hot or cold equipment | $4,260 | $3,550 |
$2,860
70,100
kWh
|
$1,400
-
kW-mo/yr
|
- | - | - | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $5,350 | $6,900 |
$4,260
104,400
kWh
|
$1,090
-
kW-mo/yr
|
- | - | - | |
04 | 2.2628: Utilize a less expensive cooling method | $126,380 | $403,440 |
$119,330
2,924,010
kWh
|
- | $7,560 | - |
$(-510.0)
-
Tgal
|
|
05 | 4.821: Pay bills on time to avoid late fees | $2,640 | - | - | - | - | $2,640 | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,440 | $29,070 |
$2,460
60,313
kWh
|
$980
-
kW-mo/yr
|
- | - | - | |
07 | 2.9114: Use solar heat to make electricty | $277,000 | $7,378,000 |
$180,650
4,426,500
kWh
|
$96,350
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $442,590 | $7,823,055 |
$328,570
8,051,260
kWh
|
$105,890
-
kW-mo/yr
|
$6,000 | $2,640 |
$(-510.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs