Assessment Year | 2006 |
---|---|
Principal Product | Printers, Printer Cartridges, Visual Equip |
NAICS | 334118: Computer Terminal and Other Computer Peripheral Equipment Manufacturing |
SIC | 3577: Computer Peripheral Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 3,000 |
Plant Area |
2,000,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $184,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $98,700 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $23,000 | $31,500 |
$23,000
671,000
kWh
|
- | - | - | |
02 | 2.4225: Install common header on compressors | $36,300 | $31,500 |
$31,200
907,200
kWh
|
$5,100
-
kW-mo/yr
|
- | - | |
03 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $39,400 | $42,000 |
$31,400
917,800
kWh
|
$8,000
-
kW-mo/yr
|
- | - | |
04 | 3.4151: Minimize water usage | $51,600 | $105,000 | - | - | - |
$51,600
-
Tgal
|
|
05 | 2.3212: Optimize plant power factor | $16,600 | $10,100 | - | - | $16,600 | - | |
06 | 2.7135: Install occupancy sensors | $15,000 | $4,800 |
$15,000
224,500
kWh
|
- | - | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $2,400 | $1,200 |
$2,400
43,000
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $184,300 | $226,100 |
$103,000
2,763,500
kWh
|
$13,100
-
kW-mo/yr
|
$16,600 |
$51,600
-
Tgal
|
||
TOTAL IMPLEMENTED | $98,700 | $105,000 |
$85,600
2,496,000
kWh
|
$13,100
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs