ITAC Assessment: OR0500
ITAC logo
ITAC Assessment: OR0500
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Printers, Printer Cartridges, Visual Equip
NAICS 334118: Computer Terminal and Other Computer Peripheral Equipment Manufacturing
SIC 3577: Computer Peripheral Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 3,000
Plant Area 2,000,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $184,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $98,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Consumption Savings
01 2.4322: Use or replace with energy efficient substitutes $23,000 $31,500 $23,000
671,000
kWh
- - -
02 2.4225: Install common header on compressors $36,300 $31,500 $31,200
907,200
kWh
$5,100
-
kW-mo/yr
- -
03 2.4222: Install adequate dryers on air lines to eliminate blowdown $39,400 $42,000 $31,400
917,800
kWh
$8,000
-
kW-mo/yr
- -
04 3.4151: Minimize water usage $51,600 $105,000 - - - $51,600
-
Tgal
05 2.3212: Optimize plant power factor $16,600 $10,100 - - $16,600 -
06 2.7135: Install occupancy sensors $15,000 $4,800 $15,000
224,500
kWh
- - -
07 2.7111: Reduce illumination to minimum necessary levels $2,400 $1,200 $2,400
43,000
kWh
- - -
TOTAL RECOMMENDED $184,300 $226,100 $103,000
2,763,500
kWh
$13,100
-
kW-mo/yr
$16,600 $51,600
-
Tgal
TOTAL IMPLEMENTED $98,700 $105,000 $85,600
2,496,000
kWh
$13,100
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs