ITAC Assessment: OR0498
ITAC logo
ITAC Assessment: OR0498
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Laundry Equipment
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3582: Commercial Laundry, Drycleaning, and Pressing Machines
Sales Range $1
M
to 5
M
# of Employees 36
Plant Area 50,000
ft2
Annual Production 80
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,433 734,080
kWh
Electricity Demand $10,254 3,347
kW-mo/yr
Electricity Fees $2,861 -
Natural Gas $32,976 3,759
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2514: Cover open tanks $7,300 $3,600 $7,300
132,000
kWh
- - -
02 2.1113: Reduce combustion air flow to optimum $1,300 - - - $1,300
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,300 $2,300 $1,800
32,000
kWh
$500
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $1,450 $1,800 $1,250
22,900
kWh
$200
-
kW-mo/yr
- -
05 2.1231: Establish burner maintenance schedule for boilers $600 $400 - - $600
-
MMBtu
-
06 2.4226: Use / purchase optimum sized compressor $5,400 $20,000 $4,300
78,000
kWh
$1,100
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,600 $17,400 $2,850
51,740
kWh
$650
-
kW-mo/yr
- $100
TOTAL RECOMMENDED $21,950 $45,500 $17,500
316,640
kWh
$2,450
-
kW-mo/yr
$1,900
-
MMBtu
$100
TOTAL IMPLEMENTED $19,200 $43,700 $16,250
293,740
kWh
$2,250
-
kW-mo/yr
$600
-
MMBtu
$100
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs