ITAC Assessment: OR0488
ITAC logo
ITAC Assessment: OR0488
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Aircraft
NAICS 336411: Aircraft Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 70,500
ft2
Annual Production 3
pieces
Production Hrs. Annual 5,620
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,148 3,002,560
kWh
Electricity Demand $50,185 10,814
kW-mo/yr
Electricity Fees $12,627 -
Natural Gas $34,648 35,176
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $600 $200 $400
10,000
kWh
$200
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $680 $2,000 - - $680 -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $28,100 $132,000 $3,900
97,090
kWh
- - $24,200
-
MMBtu
TOTAL RECOMMENDED $29,380 $134,200 $4,300
107,090
kWh
$200
-
kW-mo/yr
$680 $24,200
-
MMBtu
TOTAL IMPLEMENTED $28,700 $132,200 $4,300
107,090
kWh
$200
-
kW-mo/yr
- $24,200
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs