| Assessment Year | 2005 |
|---|---|
| Principal Product | Aircraft |
| NAICS | 336411: Aircraft Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
70,500
ft2
|
| Annual Production | 3
pieces
|
| Production Hrs. Annual | 5,620
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $117,148 | 3,002,560 |
kWh
|
$0.039 |
| Electricity Demand | $50,185 | 10,814 |
kW-mo/yr
|
$4.64 |
| Electricity Fees | $12,627 | - |
|
- |
| Natural Gas | $34,648 | 35,176 |
MMBtu
|
$0.98 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,380 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $28,700 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $600 | $200 |
$400
10,000
kWh
|
$200
-
kW-mo/yr
|
- | - | |
| 02 | 2.3212: Optimize plant power factor | $680 | $2,000 | - | - | $680 | - | |
| 03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $28,100 | $132,000 |
$3,900
97,090
kWh
|
- | - |
$24,200
-
MMBtu
|
|
| TOTAL RECOMMENDED | $29,380 | $134,200 |
$4,300
107,090
kWh
|
$200
-
kW-mo/yr
|
$680 |
$24,200
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $28,700 | $132,200 |
$4,300
107,090
kWh
|
$200
-
kW-mo/yr
|
- |
$24,200
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs