ITAC Assessment: OR0450
ITAC logo
ITAC Assessment: OR0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Treated Wood
NAICS 321114: Wood Preservation
SIC 2491: Wood Preserving
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 40,000
ft2
Annual Production 4,000,000
thousand feet
Production Hrs. Annual 8,592
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,114 1,157,383
kWh
Electricity Demand $17,513 47,020
kW-mo/yr
Electricity Fees $3,422 -
Natural Gas $218,313 35,570
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $22,700 $10,000 $20,000
374,000
kWh
$2,700
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,300 - $1,100
20,500
kWh
$200
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $6,880 - $6,080
118,260
kWh
$800
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $8,330 $14,250 - - $8,330
-
MMBtu
05 2.4133: Use most efficient type of electric motors $3,000 $3,400 $1,300
31,248
kWh
$1,700
-
kW-mo/yr
-
TOTAL RECOMMENDED $42,210 $27,650 $28,480
544,008
kWh
$5,400
-
kW-mo/yr
$8,330
-
MMBtu
TOTAL IMPLEMENTED $33,880 $13,400 $28,480
544,008
kWh
$5,400
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs