ITAC Assessment: MA0467
ITAC logo
ITAC Assessment: MA0467
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product PVC and Non-PVC Compounds
NAICS
n/a
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 91,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $717,786 10,814,478
kWh
Electricity Demand $93,283 25,698
kW-mo/yr
Electricity Fees $807 -
LPG $30,449 4,451
MMBtu
Fuel Oil #4 $80,917 18,714
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,415 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,099

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Solid Waste (non-haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,467 $640 $13,917
111,079
kWh
$1,550
-
kW-mo/yr
- -
02 2.2625: Chill water to the highest temperature possible $6,077 $4,000 $6,077
97,011
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $2,974 $4,200 - $294
-
kW-mo/yr
$2,680
-
MMBtu
-
04 2.2123: Insulate feedwater tank $1,316 $800 - - $1,316
-
MMBtu
-
05 2.2511: Insulate bare equipment $1,140 $1,500 - - $1,140
-
MMBtu
-
06 3.4131: Minimize contamination of water before treatment $951 $500 - - $929
-
MMBtu
$22
-
lb
07 2.2123: Insulate feedwater tank $490 $1,100 - - $490
-
MMBtu
-
TOTAL RECOMMENDED $28,415 $12,740 $19,994
208,090
kWh
$1,844
-
kW-mo/yr
$6,555
-
MMBtu
$22
-
lb
TOTAL IMPLEMENTED $27,099 $11,940 $19,994
208,090
kWh
$1,844
-
kW-mo/yr
$5,239
-
MMBtu
$22
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs