ITAC Assessment: OR0439
ITAC logo
ITAC Assessment: OR0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Canned Beans, Soup
NAICS 311422: Specialty Canning
SIC 2032: Canned Specialties
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 40,000,000
pieces
Production Hrs. Annual 0
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,307 7,183,129
kWh
Electricity Demand $55,186 191,700
kW-mo/yr
Electricity Fees $14,303 -
Natural Gas $860,719 165,377
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $370,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $353,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.3128: Utilize other methods to remove contaminants $330,000 $790,000 $(-20,000.0)
(-650,000)
kWh
- - - $350,000
-
lb
- -
02 2.2121: Increase amount of condensate returned $13,400 $28,000 - - $13,400
-
MMBtu
- - - -
03 2.1133: Adjust burners for efficient operation $10,500 $450 - - $11,400
-
MMBtu
- - $(-900.0) -
04 2.2136: Install / repair insulation on steam lines $4,500 $1,850 - - - $4,500
-
MMBtu
- - -
05 2.4133: Use most efficient type of electric motors $5,400 $12,100 $4,280
147,000
kWh
$1,120
-
kW-mo/yr
- - - - -
06 2.2161: Optimize operation of multi-stage vacuum steam jets $3,250 $3,000 - - - - - - $3,250
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,940 $1,850 $782
26,900
kWh
$264
-
kW-mo/yr
- - - $894 -
08 2.4224: Upgrade controls on compressors $1,260 $495 $1,000
34,400
kWh
$260
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $370,250 $837,745 $(-13,938.0)
(-441,700)
kWh
$1,644
-
kW-mo/yr
$24,800
-
MMBtu
$4,500
-
MMBtu
$350,000
-
lb
$(-6.0) $3,250
TOTAL IMPLEMENTED $353,650 $807,400 $(-15,720.0)
(-503,000)
kWh
$1,120
-
kW-mo/yr
$11,400
-
MMBtu
$4,500
-
MMBtu
$350,000
-
lb
$(-900.0) $3,250
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs