ITAC Assessment: OR0436
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Custom Cabinets
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $50
M
to 100
M
# of Employees 600
Plant Area
n/a
Annual Production 216,750
pieces
Production Hrs. Annual 2,168
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,670 3,425,380
kWh
Electricity Demand $40,578 138,720
kW-mo/yr
Electricity Fees $1,471 -
Natural Gas $65,539 9,851
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,579

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $16,500 $7,680 $14,300
258,000
kWh
$2,200
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,530 - $1,310
23,800
kWh
$220
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,840 $3,000 $2,500
45,000
kWh
$340
-
kW-mo/yr
-
04 2.4224: Upgrade controls on compressors $8,380 $6,780 $7,800
141,000
kWh
$580
-
kW-mo/yr
-
05 2.2136: Install / repair insulation on steam lines $48,169 $66,400 $11,800
214,500
kWh
$(-331.0)
-
kW-mo/yr
$36,700
-
MMBtu
TOTAL RECOMMENDED $77,419 $83,860 $37,710
682,300
kWh
$3,009
-
kW-mo/yr
$36,700
-
MMBtu
TOTAL IMPLEMENTED $74,579 $80,860 $35,210
637,300
kWh
$2,669
-
kW-mo/yr
$36,700
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs