ITAC Assessment: DL0091
ITAC logo
ITAC Assessment: DL0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Corrugated paper sheets
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 120,000
ft2
Annual Production 1,200,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,287 1,810,200
kWh
Electricity Demand $44,973 7,278
kW-mo/yr
Electricity Fees $4,800 -
Natural Gas $349,851 42,151
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,450 $39,400 $14,450
125,700
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,180 $1,500 $1,180
10,270
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,580 $2,500 $14,580
126,800
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,770 $300 $1,770
15,400
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $10,500 $16,000 - $10,500
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,830 $5,500 $8,830
76,750
kWh
-
07 2.6218: Turn off equipment when not in use $7,530 $100 $7,530
65,500
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $890 $800 $890
7,750
kWh
-
09 2.2437: Recover waste heat from equipment $2,030 $300 - $2,030
-
MMBtu
10 2.7491: Insulate glazing, walls, ceilings, and roofs $1,810 $325 - $1,810
-
MMBtu
TOTAL RECOMMENDED $63,570 $66,725 $49,230
428,170
kWh
$14,340
-
MMBtu
TOTAL IMPLEMENTED $16,350 $2,800 $16,350
142,200
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs