Assessment Year | 1994 |
---|---|
Principal Product | Plastic ice chests & containers, beverage coolers |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 450 |
Plant Area |
412,000
ft2
|
Annual Production | 12,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,791,121 | 34,546,308 |
kWh
|
$0.052 |
Natural Gas | $26,943 | 5,133 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $221,086 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $221,086 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $96,105 | $145,000 | - | - | $96,105 | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $44,845 | $120,000 |
$97,185
2,190,504
kWh
|
$(-52,340.0)
-
MMBtu
|
- | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $37,861 | $92,046 |
$76,437
1,722,157
kWh
|
$(-38,576.0)
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $26,620 | $3,800 |
$26,620
950,762
kWh
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $12,915 | $6,250 |
$12,915
461,313
kWh
|
- | - | - | |
06 | 3.7134: Wash and reuse rags on-site | $2,070 | $7,900 | - | - | - | $2,070 | |
07 | 3.8132: Use less toxic and volatile solvent substitutes | $670 | $2,400 | - | - | - | $670 | |
TOTAL RECOMMENDED | $221,086 | $377,396 |
$213,157
5,324,736
kWh
|
$(-90,916.0)
-
MMBtu
|
$96,105 | $2,740 | ||
TOTAL IMPLEMENTED | $221,086 | $377,396 |
$213,157
5,324,736
kWh
|
$(-90,916.0)
-
MMBtu
|
$96,105 | $2,740 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings |