ITAC Assessment: OR0418
ITAC logo
ITAC Assessment: OR0418
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product roofing material
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area
n/a
Annual Production 200,000
ton
Production Hrs. Annual 7,056
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,009 5,858,800
kWh
Electricity Demand $51,783 10,860
kW-mo/yr
Electricity Fees $1,614 -
Natural Gas $324,311 78,356
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,409 $1,400 $1,174
37,178
kWh
$235
-
kW-mo/yr
- -
02 2.4224: Upgrade controls on compressors $6,865 $7,600 $5,623
178,068
kWh
$1,242
-
kW-mo/yr
- -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,090 $1,800 $751
23,756
kWh
- - $339
04 2.3212: Optimize plant power factor $929 $1,500 - - $929 -
05 2.4133: Use most efficient type of electric motors $4,707 $9,446 $1,616
51,290
kWh
$3,091
-
kW-mo/yr
- -
TOTAL RECOMMENDED $15,000 $21,746 $9,164
290,292
kWh
$4,568
-
kW-mo/yr
$929 $339
TOTAL IMPLEMENTED $15,000 $21,746 $9,164
290,292
kWh
$4,568
-
kW-mo/yr
$929 $339
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs