ITAC Assessment: OR0406
ITAC logo
ITAC Assessment: OR0406
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Particle Board
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 132,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,037,873 42,431,437
kWh
Electricity Demand $228,741 71,928
kW-mo/yr
Electricity Fees $56,144 -
Natural Gas $618,931 91,714
MMBtu
Wood $563,244 197,587
MMBtu
Other Energy $540,180 140,306
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $280,995 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,596

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Wood Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.1331: Burn a less expensive grade of fuel $139,631 $27,000 - - - $246,191
-
MMBtu
$(-105,060.0)
-
MMBtu
- $(-1,500.0) -
02 2.3212: Optimize plant power factor $50,372 $92,500 - - $50,372 - - - - -
03 4.653: Maintain/enlarge a stock of spare parts $29,530 $43,240 - - - - - $390 $2,140 $27,000
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $20,752 - $16,719
784,009
kWh
$4,033
-
kW-mo/yr
- - - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,569 $8,500 $7,065
331,225
kWh
$1,504
-
kW-mo/yr
- - - - - -
06 2.4224: Upgrade controls on compressors $12,899 - $10,857
508,993
kWh
$2,042
-
kW-mo/yr
- - - - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,215 $60,000 $8,887
417,240
kWh
$2,328
-
kW-mo/yr
- - - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $8,027 $3,630 $4,745
222,504
kWh
$970
-
kW-mo/yr
- - - $(-566.0) $2,878 -
TOTAL RECOMMENDED $280,995 $234,870 $48,273
2,263,971
kWh
$10,877
-
kW-mo/yr
$50,372 $246,191
-
MMBtu
$(-105,060.0)
-
MMBtu
$(-176.0) $3,518 $27,000
TOTAL IMPLEMENTED $16,596 $12,130 $11,810
553,729
kWh
$2,474
-
kW-mo/yr
- - - $(-566.0) $2,878 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Wood Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs