ITAC Assessment: OR0394
ITAC logo
ITAC Assessment: OR0394
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Medium Density Fiberboard
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area
n/a
Annual Production 65,665,014
thousand feet
Production Hrs. Annual 7,884
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,429,092 59,315,630
kWh
Electricity Demand $420,441 1,317,768
kW-mo/yr
Natural Gas $2,308,961 523,542
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,345

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $31,896 $31,163 $26,410
868,201
kWh
$5,486
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,492 $5,000 $5,331
221,216
kWh
$1,161
-
kW-mo/yr
-
03 2.4224: Upgrade controls on compressors $11,580 $4,080 $9,630
399,164
kWh
$1,950
-
kW-mo/yr
-
04 2.7134: Use photocell controls $1,883 $2,150 $1,299
53,874
kWh
- $584
05 2.4133: Use most efficient type of electric motors $11,074 $29,915 $8,886
368,723
kWh
$2,188
-
kW-mo/yr
-
TOTAL RECOMMENDED $62,925 $72,308 $51,556
1,911,178
kWh
$10,785
-
kW-mo/yr
$584
TOTAL IMPLEMENTED $51,345 $68,228 $41,926
1,512,014
kWh
$8,835
-
kW-mo/yr
$584
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs