ITAC Assessment: OR0393
ITAC logo
ITAC Assessment: OR0393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product TV/VCR and or DVD combo units
NAICS
n/a
SIC 3651: Household Audio and Video Equipment
Sales Range $100
M
to 500
M
# of Employees 497
Plant Area 394,500
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 5,880
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,631 11,832,850
kWh
Electricity Demand $98,310 280,080
kW-mo/yr
Natural Gas $405,176 59,419
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,248,937 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 4.426: Modify workload $100,000 $15,300 n/a - - - $100,000 -
02 3.1161: Eliminate/reduce an operation $1,120,240 $662,000 n/a $42,400
825,944
kWh
- $620,340
-
MMBtu
$300,000 $157,500
03 2.4235: Remove or close off unneeded compressed air lines $1,734 $1,500 n/a $1,450
41,425
kWh
$284
-
kW-mo/yr
- - -
04 2.4226: Use / purchase optimum sized compressor $13,247 $17,800 n/a $11,273
322,089
kWh
$1,974
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $13,716 $26,090 n/a $10,182
290,492
kWh
$3,534
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $1,248,937 $722,690 $65,305
1,479,950
kWh
$5,792
-
kW-mo/yr
$620,340
-
MMBtu
$400,000 $157,500
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs