Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 135
Plant Area
n/a
Annual Production 140,385
thousand feet
Production Hrs. Annual 8,568
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,095 7,273,447
kWh
Electricity Demand $64,243 223,824
kW-mo/yr
Electricity Fees $12,018 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,205 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,059

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $89,400 $280,000 - - - - $19,200 - $70,200
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,389 $29,590 $15,389
449,297
kWh
- - - - - -
03 2.4133: Use most efficient type of electric motors $15,954 $30,046 $12,532
365,768
kWh
$3,422
-
kW-mo/yr
- - - - -
04 2.3212: Optimize plant power factor $4,853 $13,600 - - $4,853 - - - -
05 2.7134: Use photocell controls $3,605 $605 $2,873
84,701
kWh
- - - - $732 -
06 2.4224: Upgrade controls on compressors $647 - $647
18,757
kWh
- - - - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,013 - $2,577
75,322
kWh
$436
-
kW-mo/yr
- - - - -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,344 $7,500 $993
29,015
kWh
$206
-
kW-mo/yr
- $225
-
gal
$(-80.0) - -
TOTAL RECOMMENDED $134,205 $361,341 $35,011
1,022,860
kWh
$4,064
-
kW-mo/yr
$4,853 $225
-
gal
$19,120 $732 $70,200
TOTAL IMPLEMENTED $25,059 $44,251 $16,052
469,226
kWh
$3,422
-
kW-mo/yr
$4,853 - - $732 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs