| Assessment Year | 1999 |
|---|---|
| Principal Product | Wood Furniture |
| NAICS |
n/a
|
| SIC | 2511: Wood Household Furniture, Except Upholstered |
| Sales Range | $5 M to 10M |
| # of Employees | 140 |
| Plant Area |
43,500
ft2
|
| Annual Production | 2,583,000
thousand feet
|
| Production Hrs. Annual | 4,750
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $78,104 | 2,332,943 |
kWh
|
$0.033 |
| Electricity Demand | $20,347 | 77,628 |
kW-mo/yr
|
$0.26 |
| Electricity Fees | $10,286 | - |
|
- |
| Natural Gas | $9,906 | 2,094 |
MMBtu
|
$4.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $168,788 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $45,746 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.421: Modify current incentive program | $94,000 | $23,300 | - | - | - | $94,000 | |
| 02 | 4.513: Re-arrange equipment layout to reduce labor costs | $35,970 | $40,000 | - |
$(-530.0)
-
kW-mo/yr
|
- | $36,500 | |
| 03 | 4.513: Re-arrange equipment layout to reduce labor costs | $7,100 | $6,920 | - | - | - | $7,100 | |
| 04 | 4.421: Modify current incentive program | $6,490 | $6,300 | - | - | - | $6,490 | |
| 05 | 2.4322: Use or replace with energy efficient substitutes | $9,200 | $22,400 |
$7,360
216,589
kWh
|
$1,840
-
kW-mo/yr
|
- | - | |
| 06 | 2.3212: Optimize plant power factor | $1,915 | $5,400 | - | - | $1,915 | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,286 | $1,000 |
$2,655
77,960
kWh
|
$631
-
kW-mo/yr
|
- | - | |
| 08 | 2.4224: Upgrade controls on compressors | $10,827 | $1,210 |
$8,810
259,086
kWh
|
$2,017
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $168,788 | $106,530 |
$18,825
553,635
kWh
|
$3,958
-
kW-mo/yr
|
$1,915 | $144,090 | ||
| TOTAL IMPLEMENTED | $45,746 | $47,300 |
$2,655
77,960
kWh
|
$101
-
kW-mo/yr
|
- | $42,990 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs