ITAC Assessment: OR0340
ITAC logo
ITAC Assessment: OR0340
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Industrial gases
NAICS
n/a
SIC 2813: Industrial Gases
Sales Range $1
M
to 5
M
# of Employees 3
Plant Area 40,000
ft2
Annual Production 95,762
thousand feet
Production Hrs. Annual 8,592
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,003,469 47,109,321
kWh
Electricity Demand $151,333 756,828
kW-mo/yr
Electricity Fees $36,986 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $254,255 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $250,875

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings By-product Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $229,335 $1,000 $(-1,445.0)
(-67,995)
kWh
- - $(-3,220.0) - $234,000
02 3.4151: Minimize water usage $21,540 $1,480 $(-17.0)
(-879)
kWh
$(-3.0)
-
kW-mo/yr
$19,240
-
Tgal
- $2,320
-
Tgal
-
03 2.2444: Use hot process fluids to preheat incoming process fluids $3,110 $5,160 $3,110
145,955
kWh
- - - - -
04 2.7261: Install timers and/or thermostats $270 $680 $270
12,896
kWh
- - - - -
TOTAL RECOMMENDED $254,255 $8,320 $1,918
89,977
kWh
$(-3.0)
-
kW-mo/yr
$19,240
-
Tgal
$(-3,220.0) $2,320
-
Tgal
$234,000
TOTAL IMPLEMENTED $250,875 $2,480 $(-1,462.0)
(-68,874)
kWh
$(-3.0)
-
kW-mo/yr
$19,240
-
Tgal
$(-3,220.0) $2,320
-
Tgal
$234,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs