Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Travel Trailers
NAICS
n/a
SIC 3792: Travel Trailers and Campers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 67,000
ft2
Annual Production 765
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,037 868,992
kWh
Electricity Demand $15,377 44,208
kW-mo/yr
Electricity Fees $745 -
Natural Gas $23,102 4,053
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,119,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,492

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.423: Move product using mechanical means $5,106,400 $556,000 - - - - - - $5,106,400
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,650 $24,750 $(-20.0)
(-879)
kWh
$(-690.0)
-
kW-mo/yr
- $7,360
-
lb
- - -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,080 $13,800 $2,340
106,975
kWh
$740
-
kW-mo/yr
- - - - -
04 2.6218: Turn off equipment when not in use $178 - $145
6,741
kWh
- - - $15 $18 -
05 2.2437: Recover waste heat from equipment $730 $381 - - $730
-
MMBtu
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $254 $1,000 $118
5,569
kWh
$136
-
kW-mo/yr
- - - - -
07 2.4224: Upgrade controls on compressors $1,508 $1,454 $701
32,239
kWh
$807
-
kW-mo/yr
- - - - -
08 2.4239: Eliminate or reduce compressed air usage $467 $441 $225
10,258
kWh
$242
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $5,119,267 $597,826 $3,509
160,903
kWh
$1,235
-
kW-mo/yr
$730
-
MMBtu
$7,360
-
lb
$15 $18 $5,106,400
TOTAL IMPLEMENTED $11,492 $41,004 $3,139
143,904
kWh
$993
-
kW-mo/yr
- $7,360
-
lb
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs