ITAC Assessment: IA0449
ITAC logo
ITAC Assessment: IA0449
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Truck Bodies
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 222
Plant Area 200,000
ft2
Annual Production 8,061
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,877 4,384,538
kWh
Electricity Demand $72,550 12,228
kW-mo/yr
Natural Gas $333,708 35,764
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,939 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,340

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7311: Ventilation system to shut off when room is not in use $13,384 $500 $1,424
41,627
kWh
- $11,960
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,171 $500 $574
16,785
kWh
$597
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $2,181 $650 - - $2,181
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,025 $28,980 $5,097
149,040
kWh
$3,928
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $229 $1,199 $129
3,780
kWh
$100
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $5,734 $1,910 - - $5,734
-
MMBtu
07 2.2514: Cover open tanks $8,215 $6,350 - - $8,215
-
MMBtu
TOTAL RECOMMENDED $39,939 $40,089 $7,224
211,232
kWh
$4,625
-
kW-mo/yr
$28,090
-
MMBtu
TOTAL IMPLEMENTED $18,340 $33,239 $5,800
169,605
kWh
$4,625
-
kW-mo/yr
$7,915
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs