| Assessment Year | 2010 |
|---|---|
| Principal Product | Truck Bodies |
| NAICS | 336211: Motor Vehicle Body Manufacturing |
| SIC | 3713: Truck and Bus Bodies |
| Sales Range | $10 M to 50M |
| # of Employees | 222 |
| Plant Area |
200,000
ft2
|
| Annual Production | 8,061
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $149,877 | 4,384,538 |
kWh
|
$0.034 |
| Electricity Demand | $72,550 | 12,228 |
kW-mo/yr
|
$5.93 |
| Natural Gas | $333,708 | 35,764 |
MMBtu
|
$9.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,939 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,340 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7311: Ventilation system to shut off when room is not in use | $13,384 | $500 |
$1,424
41,627
kWh
|
- |
$11,960
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,171 | $500 |
$574
16,785
kWh
|
$597
-
kW-mo/yr
|
- | |
| 03 | 2.2437: Recover waste heat from equipment | $2,181 | $650 | - | - |
$2,181
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,025 | $28,980 |
$5,097
149,040
kWh
|
$3,928
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $229 | $1,199 |
$129
3,780
kWh
|
$100
-
kW-mo/yr
|
- | |
| 06 | 2.2511: Insulate bare equipment | $5,734 | $1,910 | - | - |
$5,734
-
MMBtu
|
|
| 07 | 2.2514: Cover open tanks | $8,215 | $6,350 | - | - |
$8,215
-
MMBtu
|
|
| TOTAL RECOMMENDED | $39,939 | $40,089 |
$7,224
211,232
kWh
|
$4,625
-
kW-mo/yr
|
$28,090
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,340 | $33,239 |
$5,800
169,605
kWh
|
$4,625
-
kW-mo/yr
|
$7,915
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs