ITAC Assessment: OR0334
ITAC logo
ITAC Assessment: OR0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Wood Mouldings
NAICS
n/a
SIC 2431: Millwork
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 450,000
ft2
Annual Production 24,537,182
thousand feet
Production Hrs. Annual 4,455
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $670,439 18,233,588
kWh
Electricity Demand $203,421 747,072
kW-mo/yr
Electricity Fees $28,931 -
Natural Gas $192,846 43,618
MMBtu
LPG $23,051 3,700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,188,771 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,122,748

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 4.512: Condense operation into one building $1,080,150 $1,000,000 - - - - $50,150 $1,030,000 - -
02 4.445: Install equipment to move product $14,550 $31,520 $(-30.0)
(-879)
kWh
$(-20.0)
-
kW-mo/yr
- - $14,600 - - -
03 2.4322: Use or replace with energy efficient substitutes $48,900 $220,000 $35,200
1,057,444
kWh
$13,700
-
kW-mo/yr
- - - - - -
04 2.3212: Optimize plant power factor $15,977 $44,400 - - $15,977 - - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,499 $6,000 $4,687
140,680
kWh
$1,812
-
kW-mo/yr
- - - - - -
06 2.4224: Upgrade controls on compressors $14,409 $9,600 $10,618
318,875
kWh
$3,791
-
kW-mo/yr
- - - - - -
07 2.7111: Reduce illumination to minimum necessary levels $1,890 - $1,279
38,394
kWh
- - - $193 - - $418
08 3.1191: Change procedures / equipment / operating conditions $5,250 - - - - $250
-
gal
- - $5,000 -
09 3.8141: Regenerate cleaning solvent on-site and reuse $1,146 $350 - - - $1,146
-
gal
- - - -
TOTAL RECOMMENDED $1,188,771 $1,311,870 $51,754
1,554,514
kWh
$19,283
-
kW-mo/yr
$15,977 $1,396
-
gal
$64,943 $1,030,000 $5,000 $418
TOTAL IMPLEMENTED $1,122,748 $1,047,120 $16,554
497,070
kWh
$5,583
-
kW-mo/yr
- $250
-
gal
$64,943 $1,030,000 $5,000 $418
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs