ITAC Assessment: OR0333
ITAC logo
ITAC Assessment: OR0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Manufactured Homes
NAICS
n/a
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 108,410
ft2
Annual Production 2,520
units
Production Hrs. Annual 4,536
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,168 1,133,939
kWh
Electricity Demand $7,493 39,504
kW-mo/yr
Electricity Fees $5,381 -
Natural Gas $40,433 8,494
MMBtu
LPG $4,785 626
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,985

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 3.5313: Increase amount of waste recovered for resale $19,985 - - - - $19,985
-
lb
02 2.2211: Use optimum temperature $5,560 $1,800 - - $5,560
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,495 $4,550 $1,940
57,151
kWh
$555
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $6,395 $9,600 $4,650
136,870
kWh
$1,745
-
kW-mo/yr
- -
TOTAL RECOMMENDED $34,435 $15,950 $6,590
194,021
kWh
$2,300
-
kW-mo/yr
$5,560
-
MMBtu
$19,985
-
lb
TOTAL IMPLEMENTED $19,985 - - - - $19,985
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs