ITAC Assessment: OR0326
ITAC logo
ITAC Assessment: OR0326
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Auto Accessories
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 270,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,800
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,930 4,024,912
kWh
Electricity Demand $50,366 12,403
kW-mo/yr
Electricity Fees $2,450 -
Natural Gas $34,335 7,865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,118 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $27,520 $83,400 $18,460
523,154
kWh
$12,700
-
kW-mo/yr
- $(-3,640.0)
-
MMBtu
- -
02 2.6218: Turn off equipment when not in use $6,000 - $6,000
169,988
kWh
- - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,653 $1,000 $1,974
55,979
kWh
$679
-
kW-mo/yr
- - - -
04 2.6231: Utilize controls to operate equipment only when needed $2,856 $1,210 $2,136
60,668
kWh
$720
-
kW-mo/yr
- - - -
05 2.1133: Adjust burners for efficient operation $1,680 $405 - - - $1,680
-
MMBtu
- -
06 2.3212: Optimize plant power factor $1,559 $10,400 - - $1,559 - - -
07 3.3133: Use other waste concentration methods $20,930 $13,295 - - - - $17,930
-
gal
$3,000
08 3.6192: Use a less expensive method of waste removal $5,920 $3,680 - - - - - $5,920
TOTAL RECOMMENDED $69,118 $113,390 $28,570
809,789
kWh
$14,099
-
kW-mo/yr
$1,559 $(-1,960.0)
-
MMBtu
$17,930
-
gal
$8,920
TOTAL IMPLEMENTED $26,439 $15,505 $4,110
116,647
kWh
$1,399
-
kW-mo/yr
- - $17,930
-
gal
$3,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs