ITAC Assessment: UM0181
ITAC logo
ITAC Assessment: UM0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Heat Treating
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $5
M
to 10
M
# of Employees 58
Plant Area 150,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,289 3,580,910
kWh
Electricity Demand $74,673 8,460
kW-mo/yr
Electricity Fees $4,189 -
Natural Gas $672,750 178,159
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $300 $300 $300
11,400
kWh
- -
02 2.2515: Use optimum thickness insulation $3,470 $3,540 - $3,470
-
MMBtu
-
03 2.2414: Use waste heat from hot flue gases to preheat $94,100 $71,000 - $94,100
-
MMBtu
-
04 4.424: Improve space comfort conditioning $4,520 $8,000 - - $4,520
TOTAL RECOMMENDED $102,390 $82,840 $300
11,400
kWh
$97,570
-
MMBtu
$4,520
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs