ITAC Assessment: OR0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Detectors
NAICS
n/a
SIC 3669: Communications Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 430
Plant Area
n/a
Annual Production 410,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,107 3,218,933
kWh
Electricity Demand $37,560 93,900
kW-mo/yr
Electricity Fees $254 -
Natural Gas $4,604 1,001
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $137,028 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 3.1191: Change procedures / equipment / operating conditions $59,850 $437 - - $63,350
-
lb
- - $(-3,500.0) -
02 4.321: Optimize production lot sizes and inventories $53,400 $18,750 - - - $57,000 - - $(-3,600.0)
03 3.1161: Eliminate/reduce an operation $627 - - - - - $627 - -
04 4.652: Replace existing equipment with more suitable substitutes $6,605 - - - - $4,025 - $2,580 -
05 2.4224: Upgrade controls on compressors $7,486 $1,210 $6,483
183,763
kWh
$1,003
-
kW-mo/yr
- - - - -
06 2.7111: Reduce illumination to minimum necessary levels $9,060 $2,670 $4,624
131,008
kWh
$1,512
-
kW-mo/yr
- $222 - - $2,702
TOTAL RECOMMENDED $137,028 $23,067 $11,107
314,771
kWh
$2,515
-
kW-mo/yr
$63,350
-
lb
$61,247 $627 $(-920.0) $(-898.0)
TOTAL IMPLEMENTED $75,515 $3,107 $4,624
131,008
kWh
$1,512
-
kW-mo/yr
$63,350
-
lb
$4,247 - $(-920.0) $2,702
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs