Assessment Year | 1998 |
---|---|
Principal Product | Detectors |
NAICS |
n/a
|
SIC | 3669: Communications Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 430 |
Plant Area |
n/a
|
Annual Production | 410,000
pieces
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,107 | 3,218,933 |
kWh
|
$0.036 |
Electricity Demand | $37,560 | 93,900 |
kW-mo/yr
|
$0.40 |
Electricity Fees | $254 | - |
|
- |
Natural Gas | $4,604 | 1,001 |
MMBtu
|
$4.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $137,028 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $75,515 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.1191: Change procedures / equipment / operating conditions | $59,850 | $437 | - | - |
$63,350
-
lb
|
- | - | $(-3,500.0) | - | |
02 | 4.321: Optimize production lot sizes and inventories | $53,400 | $18,750 | - | - | - | $57,000 | - | - | $(-3,600.0) | |
03 | 3.1161: Eliminate/reduce an operation | $627 | - | - | - | - | - | $627 | - | - | |
04 | 4.652: Replace existing equipment with more suitable substitutes | $6,605 | - | - | - | - | $4,025 | - | $2,580 | - | |
05 | 2.4224: Upgrade controls on compressors | $7,486 | $1,210 |
$6,483
183,763
kWh
|
$1,003
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $9,060 | $2,670 |
$4,624
131,008
kWh
|
$1,512
-
kW-mo/yr
|
- | $222 | - | - | $2,702 | |
TOTAL RECOMMENDED | $137,028 | $23,067 |
$11,107
314,771
kWh
|
$2,515
-
kW-mo/yr
|
$63,350
-
lb
|
$61,247 | $627 | $(-920.0) | $(-898.0) | ||
TOTAL IMPLEMENTED | $75,515 | $3,107 |
$4,624
131,008
kWh
|
$1,512
-
kW-mo/yr
|
$63,350
-
lb
|
$4,247 | - | $(-920.0) | $2,702 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs