ITAC Assessment: OR0302
ITAC logo
ITAC Assessment: OR0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Dried pasta and beans
NAICS
n/a
SIC 2098: Macaroni, Spaghetti, Vermicelli, and Noodles
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 75,000
ft2
Annual Production 38,000,000
lb
Production Hrs. Annual 8,064
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,602 4,261,430
kWh
Electricity Demand $14,195 97,619
kW-mo/yr
Electricity Fees $2,410 -
Natural Gas $82,070 20,536
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $550,564 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $164,376

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings By-product Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $370,800 $345,000 $(-12,342.0)
(-341,149)
kWh
- - $(-6,558.0)
-
MMBtu
- $57,600 - $332,100 -
02 4.621: Use fixtures to reduce machine changeout times $78,667 $5,000 - $(-7.0)
-
kW-mo/yr
$(-4.0) - - - - $78,678 -
03 4.441: Install automatic packing equipment $25,630 $73,000 - - - - - - - $25,630 -
04 4.652: Replace existing equipment with more suitable substitutes $11,448 $130,000 - - - - - $11,448 - - -
05 2.4133: Use most efficient type of electric motors $5,141 $8,464 $4,731
146,542
kWh
$410
-
kW-mo/yr
- - - - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,613 $1,000 $1,613
49,824
kWh
- - - - - - - -
07 2.4224: Upgrade controls on compressors $4,077 $1,210 $4,077
126,319
kWh
- - - - - - - -
08 2.4322: Use or replace with energy efficient substitutes $1,300 $7,380 $1,203
37,222
kWh
$97
-
kW-mo/yr
- - - - - - -
09 2.3212: Optimize plant power factor $2,410 $3,200 - - $2,410 - - - - - -
10 3.1191: Change procedures / equipment / operating conditions $36,223 $34,615 - - - - - - - $38,563 $(-2,340.0)
11 3.1161: Eliminate/reduce an operation $7,267 $420 - - - - $398
-
lb
$(-420.0) $7,289 - -
12 3.5317: Sell / offer by-product as animal feed $5,988 $300 - - - - $4,408
-
lb
- - - $1,580
TOTAL RECOMMENDED $550,564 $609,589 $(-718.0)
18,758
kWh
$500
-
kW-mo/yr
$2,406 $(-6,558.0)
-
MMBtu
$4,806
-
lb
$68,628 $7,289 $474,971 $(-760.0)
TOTAL IMPLEMENTED $164,376 $251,499 $4,731
146,542
kWh
$403
-
kW-mo/yr
$(-4.0) - $398
-
lb
$11,028 $7,289 $142,871 $(-2,340.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs