ITAC Assessment: SU0196
ITAC logo
ITAC Assessment: SU0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Fiber Optic Test Equipment
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 66,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,498 998,560
kWh
Electricity Demand $15,049 3,144
kW-mo/yr
Natural Gas $14,402 1,403
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,119 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,344

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $4,000 - - - $4,000
02 2.7111: Reduce illumination to minimum necessary levels $2,956 - $2,956
32,850
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $431 - $331
3,681
kWh
$100
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,388 $653 $374
4,158
kWh
$24
-
kW-mo/yr
$1,990
05 2.7135: Install occupancy sensors $344 $888 $215
2,392
kWh
$129
-
kW-mo/yr
-
TOTAL RECOMMENDED $10,119 $1,541 $3,876
43,081
kWh
$253
-
kW-mo/yr
$5,990
TOTAL IMPLEMENTED $9,344 $653 $3,330
37,008
kWh
$24
-
kW-mo/yr
$5,990
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs