Assessment Year | 1997 |
---|---|
Principal Product | Asphalt Roofing Sheet |
NAICS |
n/a
|
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 25 |
Plant Area |
35,000
ft2
|
Annual Production | 604,332
pieces
|
Production Hrs. Annual | 4,320
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $26,753 | 802,755 |
kWh
|
$0.033 |
Electricity Demand | $10,018 | 2,772 |
kW-mo/yr
|
$3.61 |
Electricity Fees | $1,942 | - |
|
- |
Natural Gas | $64,019 | 18,087 |
MMBtu
|
$3.54 |
LPG | $5,970 | 459 |
MMBtu
|
$13.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $157,454 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,323 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,710 | $500 |
$1,290
38,980
kWh
|
- | - | - | - | - | - | $70 | - | - | $350 | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,320 | $500 | - | - | - |
$1,320
-
MMBtu
|
- | - | - | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,520 | $1,000 |
$1,520
45,721
kWh
|
- | - | - | - | - | - | - | - | - | - | |
04 | 2.4224: Upgrade controls on compressors | $1,540 | $3,700 |
$1,540
46,307
kWh
|
- | - | - | - | - | - | - | - | - | - | |
05 | 2.3212: Optimize plant power factor | $861 | $2,600 | - | - | $861 | - | - | - | - | - | - | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,133 | $3,516 |
$804
24,326
kWh
|
$329
-
kW-mo/yr
|
- | - | - | - | - | - | - | - | - | |
07 | 2.1221: Replace obsolete burners with more efficient ones | $8,920 | $80,000 | - | - | - |
$8,920
-
MMBtu
|
- | - | - | - | - | - | - | |
08 | 4.211: Consider use / purchase of bulk materials where possible | $9,140 | $80,000 |
$(-410.0)
(-12,309)
kWh
|
$(-250.0)
-
kW-mo/yr
|
- | - |
$100
-
MMBtu
|
- | - | $9,700 | - | - | - | |
09 | 3.1175: Use a different or recycled raw material | $117,450 | $206,000 |
$(-4,000.0)
(-120,164)
kWh
|
- | - | - | - |
$(-38,300.0)
-
lb
|
- | - | $(-10,250.0) | $170,000 | - | |
10 | 4.513: Re-arrange equipment layout to reduce labor costs | $11,700 | $22,500 | - | - | - | - |
$200
-
MMBtu
|
- | - | $11,500 | - | - | - | |
11 | 3.1191: Change procedures / equipment / operating conditions | $2,160 | - | - | - | - | - | - | - |
$2,200
-
lb
|
- | - | - | $(-40.0) | |
TOTAL RECOMMENDED | $157,454 | $400,316 |
$744
22,861
kWh
|
$79
-
kW-mo/yr
|
$861 |
$10,240
-
MMBtu
|
$300
-
MMBtu
|
$(-38,300.0)
-
lb
|
$2,200
-
lb
|
$21,270 | $(-10,250.0) | $170,000 | $310 | ||
TOTAL IMPLEMENTED | $6,323 | $4,516 |
$2,094
63,306
kWh
|
$329
-
kW-mo/yr
|
- |
$1,320
-
MMBtu
|
- | - |
$2,200
-
lb
|
$70 | - | - | $310 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs