| Assessment Year | 1996 |
|---|---|
| Principal Product | Packaging Bags |
| NAICS |
n/a
|
| SIC | 2674: Uncoated Paper and Multiwall Bags |
| Sales Range | $50 M to 100M |
| # of Employees | 350 |
| Plant Area |
263,000
ft2
|
| Annual Production | 365,000,000
pieces
|
| Production Hrs. Annual | 6,400
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $137,346 | 6,236,518 |
kWh
|
$0.022 |
| Electricity Demand | $48,722 | 12,876 |
kW-mo/yr
|
$3.78 |
| Electricity Fees | $6,935 | - |
|
- |
| Natural Gas | $97,087 | 23,220 |
MMBtu
|
$4.18 |
| LPG | $21,040 | 2,239 |
MMBtu
|
$9.40 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $33,209 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,599 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7124: Make a practice of turning off lights when not needed | $2,492 | - |
$2,033
90,563
kWh
|
- | - | - | - | $62 | $397 | - | |
| 02 | 2.2437: Recover waste heat from equipment | $6,734 | $1,778 | - | - |
$6,734
-
MMBtu
|
- | - | - | - | - | |
| 03 | 2.4224: Upgrade controls on compressors | $8,541 | $2,640 |
$6,416
285,170
kWh
|
$2,125
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $2,832 | $11,104 |
$2,069
92,028
kWh
|
$763
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 05 | 3.4114: Replace city water with recycled water via cooling tower | $1,797 | $7,440 |
$(-396.0)
(-17,585)
kWh
|
$(-164.0)
-
kW-mo/yr
|
- | - |
$1,587
-
Tgal
|
- | - |
$770
-
Tgal
|
|
| 06 | 2.1332: Convert combustion equipment to burn natural gas | $10,813 | $70,548 |
$(-291.0)
(-12,603)
kWh
|
$(-576.0)
-
kW-mo/yr
|
$(-9,360.0)
-
MMBtu
|
$21,040
-
MMBtu
|
- | - | - | - | |
| TOTAL RECOMMENDED | $33,209 | $93,510 |
$9,831
437,573
kWh
|
$2,148
-
kW-mo/yr
|
$(-2,626.0)
-
MMBtu
|
$21,040
-
MMBtu
|
$1,587
-
Tgal
|
$62 | $397 |
$770
-
Tgal
|
||
| TOTAL IMPLEMENTED | $20,599 | $15,522 |
$10,518
467,761
kWh
|
$2,888
-
kW-mo/yr
|
$6,734
-
MMBtu
|
- | - | $62 | $397 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs