Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Manufacturing Machines
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 68,000
ft2
Annual Production 20
units
Production Hrs. Annual 4,380
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,597 1,294,560
kWh
Electricity Demand $61,113 3,045
kW-mo/yr
Electricity Fees $11,994 -
Natural Gas $7,688 1,212
MMBtu
Waste Disposal Costs
Water Usage $3,218 579
Tgal
TOTAL YEARLY COSTS $135,610
RECOMMENDED SAVINGS* $66,932 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $30,400 $894,000 $22,400
562,600
kWh
$8,000
-
kW-mo/yr
- - -
02 2.8227: Adjust / maintain fork lift trucks for most efficient operation $2,098 $10,625 $18
450
kWh
- - $2,080 -
03 2.7124: Make a practice of turning off lights when not needed $454 $25 $400
10,010
kWh
$54
-
kW-mo/yr
- - -
04 2.7272: Install heat pipes / raise cooling setpoint $118 - $70
1,752
kWh
$48
-
kW-mo/yr
- - -
05 2.4322: Use or replace with energy efficient substitutes $156 $500 $140
3,500
kWh
$16
-
kW-mo/yr
- - -
06 2.8121: Apply for tax-free status for energy purchases $4,160 $8,000 - - $4,160 - -
07 2.7141: Lower light fixtures in high ceiling areas $29,546 $160,998 $(-1,020.0)
(-25,500)
kWh
$(-84.0)
-
kW-mo/yr
- - $30,650
TOTAL RECOMMENDED $66,932 $1,074,148 $22,008
552,812
kWh
$8,034
-
kW-mo/yr
$4,160 $2,080 $30,650
TOTAL IMPLEMENTED $29,820 $161,498 $(-810.0)
(-20,248)
kWh
$(-20.0)
-
kW-mo/yr
- - $30,650
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs