ITAC Assessment: OR0277
ITAC logo
ITAC Assessment: OR0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product air shafts and chucks
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 56,000
ft2
Annual Production 900,000
lb
Production Hrs. Annual 4,224
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,092 990,914
kWh
Electricity Demand $7,613 3,360
kW-mo/yr
Natural Gas $18,908 3,715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,203

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
01 2.2515: Use optimum thickness insulation $12,794 $20,784 - - $12,794
-
MMBtu
- -
02 3.3133: Use other waste concentration methods $5,324 $10,000 - - - $6,124
-
gal
$(-800.0)
03 2.4224: Upgrade controls on compressors $952 $3,840 $485
25,205
kWh
$467
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $927 $4,907 $501
26,084
kWh
$426
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $19,997 $39,531 $986
51,289
kWh
$893
-
kW-mo/yr
$12,794
-
MMBtu
$6,124
-
gal
$(-800.0)
TOTAL IMPLEMENTED $7,203 $18,747 $986
51,289
kWh
$893
-
kW-mo/yr
- $6,124
-
gal
$(-800.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs