Assessment Year | 1996 |
---|---|
Principal Product | apple juice concentrate |
NAICS |
n/a
|
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
41,500
ft2
|
Annual Production | 69,772,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $153,568 | 6,148,300 |
kWh
|
$0.025 |
Electricity Demand | $101,723 | 17,796 |
kW-mo/yr
|
$5.72 |
Natural Gas | $278,738 | 72,501 |
MMBtu
|
$3.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $271,838 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $247,976 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.4114: Replace city water with recycled water via cooling tower | $11,768 | $11,600 |
$(-1,041.0)
(-47,186)
kWh
|
$(-1,051.0)
-
kW-mo/yr
|
- | - |
$13,860
-
Tgal
|
|
02 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $247,053 | $1,000,000 |
$(-13,135.0)
(-594,666)
kWh
|
$(-4,794.0)
-
kW-mo/yr
|
- |
$264,982
-
lb
|
- | |
03 | 2.1232: Keep boiler tubes clean | $1,014 | $1,000 | - | - |
$1,014
-
MMBtu
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $923 | $2,220 |
$577
4,396
kWh
|
$346
-
kW-mo/yr
|
- | - | - | |
05 | 2.6232: Install set-back timers | $11,080 | $105,000 |
$9,810
444,314
kWh
|
$1,270
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $271,838 | $1,119,820 |
$(-3,789.0)
(-193,142)
kWh
|
$(-4,229.0)
-
kW-mo/yr
|
$1,014
-
MMBtu
|
$264,982
-
lb
|
$13,860
-
Tgal
|
||
TOTAL IMPLEMENTED | $247,976 | $1,002,220 |
$(-12,558.0)
(-590,270)
kWh
|
$(-4,448.0)
-
kW-mo/yr
|
- |
$264,982
-
lb
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs