ITAC Assessment: OR0262
ITAC logo
ITAC Assessment: OR0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Extruded Aluminum Parts
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 170,000
ft2
Annual Production 64,000,000
lb
Production Hrs. Annual 7,904
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $260,752 8,080,891
kWh
Electricity Demand $41,567 16,761
kW-mo/yr
Electricity Fees $17,533 -
Natural Gas $91,514 58,642
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $260,922 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Water Consumption Savings
01 3.4111: Use closed cycle process to minimize waste water production $35,059 $1,690 $(-147.0)
(-4,396)
kWh
$(-22.0)
-
kW-mo/yr
- - $25,566
-
Tgal
- - $9,662
-
Tgal
02 3.5111: Filter and reuse hydraulic oil $53,160 $3,850 - - - - - - $53,160 -
03 3.1192: Reduce scrap production $130,236 $29,640 - - - - - $133,200
-
lb
$(-2,964.0) -
04 2.1113: Reduce combustion air flow to optimum $28,400 $8,250 - - - $28,400
-
MMBtu
- - - -
05 2.3212: Optimize plant power factor $3,101 $6,600 - - $3,101 - - - - -
06 2.4133: Use most efficient type of electric motors $4,084 $10,701 $3,408
104,045
kWh
$676
-
kW-mo/yr
- - - - - -
07 2.4224: Upgrade controls on compressors $6,882 $27,454 $6,120
186,694
kWh
$762
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $260,922 $88,185 $9,381
286,343
kWh
$1,416
-
kW-mo/yr
$3,101 $28,400
-
MMBtu
$25,566
-
Tgal
$133,200
-
lb
$50,196 $9,662
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs