| Assessment Year | 1995 |
|---|---|
| Principal Product | Pipes |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
600,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 7,968
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $150,494 | 4,122,509 |
kWh
|
$0.037 |
| Natural Gas | $28,478 | 5,391 |
MMBtu
|
$5.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $45,637 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $43,099 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4224: Upgrade controls on compressors | $10,230 | $5,900 |
$10,230
344,666
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,211 | $3,000 |
$2,211
69,461
kWh
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $374 | $521 |
$374
11,430
kWh
|
- | - | |
| 04 | 2.3212: Optimize plant power factor | $2,538 | $7,200 |
$2,538
-
kWh
|
- | - | |
| 05 | 3.4157: Replace water cooling on processes with air cooling | $23,384 | $10,772 | - | - |
$23,384
-
Tgal
|
|
| 06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $6,900 | - | - |
$6,900
-
lb
|
- | |
| TOTAL RECOMMENDED | $45,637 | $27,393 |
$15,353
425,557
kWh
|
$6,900
-
lb
|
$23,384
-
Tgal
|
||
| TOTAL IMPLEMENTED | $43,099 | $20,193 |
$12,815
425,557
kWh
|
$6,900
-
lb
|
$23,384
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs