ITAC Assessment: OR0247
ITAC logo
ITAC Assessment: OR0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Pipes
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 600,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,968
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,494 4,122,509
kWh
Natural Gas $28,478 5,391
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,637 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,099

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.4224: Upgrade controls on compressors $10,230 $5,900 $10,230
344,666
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,211 $3,000 $2,211
69,461
kWh
- -
03 2.4133: Use most efficient type of electric motors $374 $521 $374
11,430
kWh
- -
04 2.3212: Optimize plant power factor $2,538 $7,200 $2,538
-
kWh
- -
05 3.4157: Replace water cooling on processes with air cooling $23,384 $10,772 - - $23,384
-
Tgal
06 3.5315: Lease / purchase baler; sell cardboard to recycler $6,900 - - $6,900
-
lb
-
TOTAL RECOMMENDED $45,637 $27,393 $15,353
425,557
kWh
$6,900
-
lb
$23,384
-
Tgal
TOTAL IMPLEMENTED $43,099 $20,193 $12,815
425,557
kWh
$6,900
-
lb
$23,384
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs