ITAC Assessment: OR0227
ITAC logo
ITAC Assessment: OR0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Paint
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 1,113
Tgal
Production Hrs. Annual 6,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,856 762,603
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,912

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Gaseous Waste Savings By-product Production Savings
01 2.2437: Recover waste heat from equipment $1,632 $935 - $1,632
-
MMBtu
- - -
02 2.4226: Use / purchase optimum sized compressor $2,991 $250 $2,991
124,560
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $932 $1,184 $932
15,533
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,482 $12,000 $1,482
22,274
kWh
- - - -
05 2.4133: Use most efficient type of electric motors $57 $329 $57
1,172
kWh
- - - -
06 3.4115: Recover and reuse cooling water $6,300 $5,200 $(-72.0)
(-2,345)
kWh
- $6,372
-
Tgal
- -
07 3.3127: Use adsorption, ion exchange to remove contaminants $98,000 $1,180,000 $(-11,308.0)
(-378,077)
kWh
- - $1,908
-
lb
$107,400
TOTAL RECOMMENDED $111,394 $1,199,898 $(-5,918.0)
(-216,883)
kWh
$1,632
-
MMBtu
$6,372
-
Tgal
$1,908
-
lb
$107,400
TOTAL IMPLEMENTED $11,912 $7,898 $3,908
138,920
kWh
$1,632
-
MMBtu
$6,372
-
Tgal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Gaseous Waste Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs