ITAC Assessment: SF0540
ITAC logo
ITAC Assessment: SF0540
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Print
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 130,000
ft2
Annual Production 312,000
lb
Production Hrs. Annual 5,140
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,707 2,015,832
kWh
Electricity Demand $248,182 7,464
kW-mo/yr
Natural Gas $22,744 1,985
MMBtu
TOTAL YEARLY COSTS $532,633
RECOMMENDED SAVINGS* $124,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,689

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $3,623 - $1,463
11,269
kWh
$2,160
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,827 - $4,167
32,098
kWh
- $(-2,340.0) -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,339 $325 $991
7,636
kWh
$348
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,918 $19,682 $5,501
42,372
kWh
$5,184
-
kW-mo/yr
$496 $(-263.0)
05 2.4322: Use or replace with energy efficient substitutes $242 $688 $242
1,863
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,740 $21,083 $3,877
29,865
kWh
$2,863
-
kW-mo/yr
- -
07 2.9114: Use solar heat to make electricty $99,319 $402,121 $60,438
465,516
kWh
$38,881
-
kW-mo/yr
- -
TOTAL RECOMMENDED $124,008 $443,899 $76,679
590,619
kWh
$49,436
-
kW-mo/yr
$(-1,844.0) $(-263.0)
TOTAL IMPLEMENTED $24,689 $41,778 $16,241
125,103
kWh
$10,555
-
kW-mo/yr
$(-1,844.0) $(-263.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs