Assessment Year | 2019 |
---|---|
Principal Product | |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
130,000
ft2
|
Annual Production | 312,000
lb
|
Production Hrs. Annual | 5,140
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $261,707 | 2,015,832 |
kWh
|
$0.13 |
Electricity Demand | $248,182 | 7,464 |
kW-mo/yr
|
$33.25 |
Natural Gas | $22,744 | 1,985 |
MMBtu
|
$11.46 |
TOTAL YEARLY COSTS | $532,633 | |||
RECOMMENDED SAVINGS* | $124,008 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,689 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $3,623 | - |
$1,463
11,269
kWh
|
$2,160
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,827 | - |
$4,167
32,098
kWh
|
- | $(-2,340.0) | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,339 | $325 |
$991
7,636
kWh
|
$348
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,918 | $19,682 |
$5,501
42,372
kWh
|
$5,184
-
kW-mo/yr
|
$496 | $(-263.0) | |
05 | 2.4322: Use or replace with energy efficient substitutes | $242 | $688 |
$242
1,863
kWh
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,740 | $21,083 |
$3,877
29,865
kWh
|
$2,863
-
kW-mo/yr
|
- | - | |
07 | 2.9114: Use solar heat to make electricty | $99,319 | $402,121 |
$60,438
465,516
kWh
|
$38,881
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $124,008 | $443,899 |
$76,679
590,619
kWh
|
$49,436
-
kW-mo/yr
|
$(-1,844.0) | $(-263.0) | ||
TOTAL IMPLEMENTED | $24,689 | $41,778 |
$16,241
125,103
kWh
|
$10,555
-
kW-mo/yr
|
$(-1,844.0) | $(-263.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs