ITAC Assessment: AS0330
ITAC logo
ITAC Assessment: AS0330
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Bee Pollen Products
NAICS
n/a
SIC 2032: Canned Specialties
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 43,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 2,151
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,921 679,734
kWh
Electricity Demand $9,635 5,603
kW-mo/yr
Electricity Fees $12,290 -
Natural Gas $1,270 104
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,018 $3,240 $596
12,260
kWh
$350
-
kW-mo/yr
- - - $72
02 2.7142: Utilize higher efficiency lamps and/or ballasts $948 $3,673 $666
13,659
kWh
$282
-
kW-mo/yr
- - - -
03 2.7145: Install skylights $1,360 $5,352 $1,360
27,982
kWh
- - - - -
04 2.7135: Install occupancy sensors $230 $975 $164
3,358
kWh
$66
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $256 $60 $139
2,862
kWh
$117
-
kW-mo/yr
- - - -
06 3.5217: Reuse / recycle/ sell paper products $832 $60 - - $832
-
lb
- - -
07 4.123: Reduce defects by reducing product tipping $259 $65 $92
1,894
kWh
$59
-
kW-mo/yr
- $108 - -
08 4.513: Re-arrange equipment layout to reduce labor costs $23,186 $8,988 - - - - $23,186 -
TOTAL RECOMMENDED $28,089 $22,413 $3,017
62,015
kWh
$874
-
kW-mo/yr
$832
-
lb
$108 $23,186 $72
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs