ITAC Assessment: MS0201
ITAC logo
ITAC Assessment: MS0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Linerboard
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $100
M
to 500
M
# of Employees 560
Plant Area 28,750,000
ft2
Annual Production 1,000,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,429,444 214,773,450
kWh
Electricity Demand $1,843,512 217,652
kW-mo/yr
Electricity Fees $2,179,504 -
Natural Gas $24,782,042 4,588,840
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,647 $9,315 $7,917
306,858
kWh
$3,559
-
kW-mo/yr
$171
02 2.7142: Utilize higher efficiency lamps and/or ballasts $75,640 $145,111 $51,412
1,991,793
kWh
$23,111
-
kW-mo/yr
$1,117
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,132 $35,712 $18,849
730,363
kWh
- $283
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,267 $340 $5,190
201,055
kWh
- $77
05 2.7261: Install timers and/or thermostats $1,593 $1,063 $1,570
60,668
kWh
- $23
TOTAL RECOMMENDED $113,279 $191,541 $84,938
3,290,737
kWh
$26,670
-
kW-mo/yr
$1,671
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs