Assessment Year | 1994 |
---|---|
Principal Product | Milk, Cottage Cheese, Sour Cream, Buttermilk |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
10,500
ft2
|
Annual Production | 76,689,105
lb
|
Production Hrs. Annual | 7,384
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,850 | 1,837,632 |
kWh
|
$0.036 |
Natural Gas | $47,712 | 11,493 |
MMBtu
|
$4.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,941 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,154 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $872 | $643 |
$872
30,774
kWh
|
- | - | - | - | |
02 | 2.7134: Use photocell controls | $152 | $50 |
$39
1,172
kWh
|
- | - | $113 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $711 | $364 |
$75
2,638
kWh
|
- | - | $636 | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $236 | $427 |
$236
7,327
kWh
|
- | - | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $308 | $978 |
$308
8,499
kWh
|
- | - | - | - | |
06 | 2.3212: Optimize plant power factor | $2,527 | $2,400 |
$2,527
-
kWh
|
- | - | - | - | |
07 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $14,967 | $12,300 |
$(-33.0)
(-1,465)
kWh
|
- | - | - | $15,000 | |
08 | 2.2623: Minimize condenser cooling water temperature | $196 | $900 |
$196
8,206
kWh
|
- | - | - | - | |
09 | 2.5123: Reduce fluid flow rates | $6,185 | $7,611 | - |
$2,404
-
MMBtu
|
$3,781
-
Tgal
|
- | - | |
10 | 3.4115: Recover and reuse cooling water | $1,787 | $2,824 | - | - |
$1,787
-
Tgal
|
- | - | |
TOTAL RECOMMENDED | $27,941 | $28,497 |
$4,220
57,151
kWh
|
$2,404
-
MMBtu
|
$5,568
-
Tgal
|
$749 | $15,000 | ||
TOTAL IMPLEMENTED | $26,154 | $25,673 |
$4,220
57,151
kWh
|
$2,404
-
MMBtu
|
$3,781
-
Tgal
|
$749 | $15,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs