ITAC Assessment: AM0497
ITAC logo
ITAC Assessment: AM0497
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Newspaper inserts, mailings
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $50
M
to 100
M
# of Employees 154
Plant Area 132,000
ft2
Annual Production 9,280,000
pieces
Production Hrs. Annual 4,732
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,522 5,977,488
kWh
Electricity Demand $66,920 15,334
kW-mo/yr
Electricity Fees $9,816 -
Natural Gas $5,527 525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $45,000 $1,000 $34,600
653,000
kWh
$10,400
-
kW-mo/yr
-
02 2.7124: Make a practice of turning off lights when not needed $4,560 - $3,400
64,100
kWh
$1,160
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $3,030 - $3,030
57,200
kWh
- -
04 2.7124: Make a practice of turning off lights when not needed $2,600 - $2,600
49,140
kWh
- -
05 3.7123: Use continuous processing $2,500 - - - $2,500
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,390 $1,270 $430
8,100
kWh
$60
-
kW-mo/yr
$1,900
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,000 - $1,560
29,400
kWh
$440
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,690 $4 $1,300
24,500
kWh
$390
-
kW-mo/yr
-
09 2.6218: Turn off equipment when not in use $1,560 - $1,560
29,500
kWh
- -
10 2.7124: Make a practice of turning off lights when not needed $950 $150 $730
13,800
kWh
$220
-
kW-mo/yr
-
11 2.4314: Use synthetic lubricant $690 - $430
8,100
kWh
$260
-
kW-mo/yr
-
12 2.7124: Make a practice of turning off lights when not needed $630 - $500
9,400
kWh
$130
-
kW-mo/yr
-
TOTAL RECOMMENDED $67,600 $2,424 $50,140
946,240
kWh
$13,060
-
kW-mo/yr
$4,400
TOTAL IMPLEMENTED $54,620 $2,424 $41,650
786,100
kWh
$11,070
-
kW-mo/yr
$1,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs